Skip to content

Utah · Colorado · Farm and ranch energy

Capital is not the constraint in rural energy. Documented projects are.

AgX is the independent back office that turns Utah and Colorado farm energy spend into verified project files, paid for by the farm and built for the capital on the other side.

$707M Utah + Colorado farm fuel and utility spend a year USDA NASS 2022 Census, Table 4 · checked Nov 28, 2026
$16–21/kW Colorado co-op demand charges, vs $7.66–8.80 at Rocky Mountain Power Morgan County REA, Poudre Valley REA, RMP rate schedules · checked Nov 28, 2026
Dec 31, 2027 In-service deadline for wind and solar credits that begin construction after July 4, 2026 IRC 48E · checked Nov 28, 2026

02 / The thesis

The money exists. The farm-side files do not.

Farm energy spend in the two states is large and concentrated. What is missing is the paperwork that lets a lender, utility or credit buyer act on it.

$707M Utah + Colorado farm fuel and utility spend a year USDA NASS 2022 Census, Table 4 · checked Nov 28, 2026
~$485M held by farms spending $25,000+ on fuel (~2,950) or utilities (~2,060); many are in both
■ ~$485M · $25k+ spenders▨ rest of $707M
USDA NASS 2022 Census, Table 4 · checked Nov 28, 2026

On the record

“We as a country haven't built energy for 20 years, and so financing energy seems like a safe bet.”
Marc Rowan, CEO, Apollo · TomorrowX Summit, Austin, November 2026. Apollo is not affiliated with AgX. TomorrowX Summit remarks · checked Nov 28, 2026

03 / The clock

Why 2026–2027 is the window.

A new grant rule, an unpublished application window and a hard in-service date for wind and solar credits all land inside the next thirteen months.

  1. Oct 16, 2026

    USDA REAP final rule effective. Pays only after 12+ months of operation.

    91 FR 62600 · checked Nov 28, 2026
  2. Today · Nov 28, 2026

    Programs on this page checked against agency text.

  3. Next REAP window

    Dates not yet published.

    Rule under legal challenge, D.D.C. 1:26-cv-03384 D.D.C. docket · checked Nov 28, 2026
  4. Dec 31, 2027

    48E in-service deadline for wind and solar that start construction after July 4, 2026.

    IRC 48E · checked Nov 28, 2026
  5. 2033

    Storage keeps full credit if construction starts by then.

    IRC 48E · checked Nov 28, 2026

04 / The financing gap

USDA now pays after the build. Someone has to fund the build.

Farms must fund 100% up front and operate 12+ months before competing for a grant of up to 25%: caps of $500,000 for renewables and $250,000 for efficiency. Ground-mount solar and wind on cropland are excluded. 91 FR 62600 · checked Nov 28, 2026

Illustrative project · capital stack

$750,000 project cost

Illustrative only. How grants and credits combine must be confirmed by a CPA for each project.

05 / The method

One farm. One file. Built to federal-audit standard.

Farm records go in. One standard file comes out, written for whoever sits on the other side of the project.

In · farm records

Farm records

  • 24 months of power bills
  • Fuel invoices
  • Equipment list

AgX file

The project file

  • Free programs first
  • Eligibility tests
  • Pre/post metering plan
  • Stacked credits and grants
LenderBorrower file
UtilityEnrolled flexible kW
Credit platformDocumented credit
DeveloperLandowner site-readiness file

←Fee: paid by the farm client.

  1. 01

    Intake

    Bills, invoices and equipment gathered into one baseline.

  2. 02

    Free programs first

    No-cost tariff and utility programs before any capital project.

  3. 03

    Project file

    Eligibility, metering and the program stack, each with its citation.

  4. 04

    Life of the asset

    Compliance and renewals for as long as the asset runs.

File standard

Every AgX project file has the same five parts.

The same format for every farm, so a lender or credit buyer reads the tenth file as fast as the first, and files can be pooled.

AgX project fileFarm ID · ————
  1. Eligibility tests §1
  2. 24 months of baseline bills §2
  3. Pre/post metering plan §3
  4. Program stack with citations §4
  5. Compliance calendar §5

Specimenillustrative, not a client file

Aerial view of center-pivot fields crossed by a transmission line

06 / The map

Where the farm-side value sits.

Four views of the same two states: what farms spend, what they pay per kilowatt, where large load and geothermal are arriving, and where the dairy herds are.

UTAHCOLORADO $531.4M $175.7M POUDRE VALLEY REA MORGAN CO. REA CO-OPS $16–21/KW RMP $7.66–8.80/KW DATA CENTERS 2,606 MW MILLARD BEAVER 218,000 COWS 95,000 COWS
Schematic, not to survey scale.

A · Spend

Colorado fuels
$280.2M
Colorado utilities
$251.2M
Utah fuels
$100.1M
Utah utilities
$75.6M
USDA NASS 2022 Census · checked Nov 28, 2026

B · Utility price

Colorado co-op demand charges
$16–21/kW
Rocky Mountain Power
$7.66–8.80/kW
Morgan County REA, Poudre Valley REA, RMP rate schedules · checked Nov 28, 2026

C · Grid and subsurface

2,606 MW

Utah data centers under construction or permitted.

Utah legislative staff, March 2026 · checked Nov 28, 2026 $24.7M

BLM geothermal lease sale in Millard and Beaver counties; top bid $1,207/acre.

BLM, Aug 18, 2026 · checked Nov 28, 2026

D · Dairy

Colorado milk cows
218,000
Utah milk cows
95,000
USDA, Sept 2026 · checked Nov 28, 2026

Treasury Notice 2026-53 (Sept 8, 2026) lets existing digesters score 45Z against the farm's own past manure handling. That is a documentation job.

Treasury Notice 2026-53 · checked Nov 28, 2026

07 / Where private capital is going

Private capital is building power next to load. It needs land, water and permission.

01

Fervo Cape Station

Beaver County, Utah

396 MW · 15 years

Google signed a 396 MW, 15-year contract for geothermal power.

Fervo · checked Nov 28, 2026
03

Insurance capital, on-site power

Investment-grade yield

$5.34B · 49% · 2.6 GW

Blackstone Credit & Insurance, with Apollo and KKR insurance accounts, paid $5.34B for 49% of Williams' 2.6 GW of on-site gas plants.

Williams · checked Nov 28, 2026

Scale it needs

Ticket sizes start where single farm projects stop.

How AgX bridges it

Small farm projects become investable when standardized and pooled.

$300M

Nexamp aggregation facility, closed June 2026.

Nexamp · checked Nov 28, 2026
~$3.7B

C-PACE originated nationally in 2025. C-PACE covers farm property in Utah and Colorado.

C-PACE national totals, 2025 · checked Nov 28, 2026
$0.900

Per dollar, small distributed-solar credits traded in Q3 2026.

Crux · checked Nov 28, 2026

AgX's role

Originate, standardize and service the farm side. AgX never owns, lends or brokers.

08 / Four lines

Four lines of work, one file format.

Each line answers the same five questions, in the same order.

Power line on a farm road

Power

What AgX does
Tariff review and flexible-load enrollment.
Program levers
RMP Irrigation Load Control, $33.31–$39.97/kW per season. RMP Schedule 105 · checked Nov 28, 2026
Market data point
Xcel Colorado aggregator program, up to $264.56/kW-year; approved Dec 15, 2025; 25 MW a year through 2030. CO PUC · checked Nov 28, 2026
Who it serves
Irrigated farms with pump and pivot load.
How AgX is paid
Paid by the farm client.
Diesel farm equipment

Diesel

What AgX does
Procurement, off-road fuel-tax recovery and engine replacement.
Program levers
Colorado Clean Diesel up to 45%; Utah Clean Fleet 25–45%. CDPHE, Utah DEQ · checked Nov 28, 2026
Market data point
Rocky Mountain diesel $5.772/gal on Nov 23, 2026, up $2.05 in a year. EIA · checked Nov 28, 2026
Who it serves
Row-crop, hay and ranch operations running off-road equipment.
How AgX is paid
Paid by the farm client.
Freight truck on a rural highway

Freight

What AgX does
Convenes pooled lanes for small producers. Carriers contract directly with producers.
Program levers
Value-Added Producer Grant freight funding. USDA VAPG · checked Nov 28, 2026
Market data point
Refrigerated spot $3.60/mile in Oct 2026, up $1.12 y/y. DAT · checked Nov 28, 2026
Who it serves
Small producers shipping refrigerated and specialty product.
How AgX is paid
No freight-linked fee.
Open farmland

Land

What AgX does
Landowner site-readiness files.
Program levers
Licensed brokers and attorneys negotiate; AgX prepares the file.
Market data point
BLM geothermal lease sale top bid $1,207/acre, Millard and Beaver counties. BLM, Aug 18, 2026 · checked Nov 28, 2026
Who it serves
Landowners near substations, transmission, pipelines and water.
How AgX is paid
AgX takes no lease fee.

09 / Partners

Three doors in. The farm pays for every one.

What each partner receives, the stage it arrives at, and who pays for it.

Door 01

Capital

Lenders, infrastructure and private-credit funds.

You get
A screened, documented project pipeline and borrower files; REAP guaranteed-loan packaging; pooled programs.
Stage
Pre-underwriting.
How AgX is paid
By the farm client, never contingent on the financing.

Door 02

Utilities

Investor-owned utilities and rural co-ops.

You get
Enrolled flexible irrigation load and pump-site batteries.
Stage
Enrollment.
How AgX is paid
By the farm client.

Door 03

Developers

Solar, storage, transmission, data center, RNG and geothermal.

You get
Landowner site-readiness files and dairy baseline documentation.
Stage
Pre-LOI.
How AgX is paid
Advisory only, paid by the landowner.

AgX does not broker securities, real estate or freight. AgX takes no fee from lenders, developers, credit buyers or carriers.

10 / Why AgX

Four claims, each with its proof.

Independent

No installer or developer conflict under the new REAP rule.

Embedded

A back office already doing federal and state funding work for producers in Utah and Colorado.

Verified

Every program fact checked against the agency's own text and dated.

Standardized

One file format, so projects can be pooled.

11 / Program tracker

Utah and Colorado programs, dated.

Every row checked against the agency's own text on Nov 28, 2026.

ProgramWhat it paysStatus / dateSource
USDA REAP grantUp to 25%, $500k / $250k caps, post-buildRule effective Oct 16, 2026; next window not published91 FR 62600 · checked Nov 28, 2026
REAP guaranteed loanUp to 75% of cost, $25M cap, 80% guaranteeOpenFederal Register, Mar 9, 2026 · checked Nov 28, 2026
IRC 48E30% (under 1 MW)Wind/solar in service by Dec 31, 2027IRC 48E · checked Nov 28, 2026
Utah RESTC10%, up to $50,000 per unitIn service before Jan 1, 2028Utah Code 59-7-614 · checked Nov 28, 2026
Elective payCredit as cash for tax-exempt owners, incl. 501(c)(12)—IRC 6417 · checked Nov 28, 2026
RMP Irrigation Load Control$33.31–$39.97/kW per seasonEnroll before late MayRMP Schedule 105 · checked Nov 28, 2026
Xcel aggregator programUp to $264.56/kW-year25 MW/yr through 2030CO PUC, Dec 15, 2025 · checked Nov 28, 2026
Colorado Clean DieselUp to 45%RollingCDPHE · checked Nov 28, 2026
Utah Clean Fleet25–45%OpenUtah DEQ · checked Nov 28, 2026

12 / Status and next 120 days

Where the desk stands today.

Verified items only.

  • Nov 28, 2026

    agx.farm registered.

  • Entity

    Ag Resource X LLC: Utah limited liability company.

  • Next · Q1 2027

    Partner brief, file standard, and first pooled program design.

13 / Risks

What could slow this down.

  1. REAP rule under legal challenge

    D.D.C. 1:26-cv-03384; next window dates unpublished.

    D.D.C. docket · checked Nov 28, 2026
  2. 48E in-service deadline

    Dec 31, 2027 compresses wind and solar timelines.

    IRC 48E · checked Nov 28, 2026
  3. Local permitting and landowner opposition

    Projects near load still need county approval and neighbors.

  4. Tariff changes

    Demand charges and load-control payments are set by rate cases and can move.

  5. Program funding levels

    Grant and rebate pools depend on appropriations.

  6. Small team

    Which is why every file is standardized.