Fervo Cape Station
Beaver County, Utah
Google signed a 396 MW, 15-year contract for geothermal power.
Fervo · checked Nov 28, 2026Utah · Colorado · Farm and ranch energy
AgX is the independent back office that turns Utah and Colorado farm energy spend into verified project files, paid for by the farm and built for the capital on the other side.
01 / Key documents · PDF · on request
The desk, the market and how AgX is paid. Sent by email.
File standard
Eligibility, baseline, metering, program stack, compliance.
Program tracker
What each program pays, its status and its source.
02 / The thesis
Farm energy spend in the two states is large and concentrated. What is missing is the paperwork that lets a lender, utility or credit buyer act on it.
On the record
“We as a country haven't built energy for 20 years, and so financing energy seems like a safe bet.”
03 / The clock
A new grant rule, an unpublished application window and a hard in-service date for wind and solar credits all land inside the next thirteen months.
USDA REAP final rule effective. Pays only after 12+ months of operation.
91 FR 62600 · checked Nov 28, 2026Programs on this page checked against agency text.
Dates not yet published.
Rule under legal challenge, D.D.C. 1:26-cv-03384 D.D.C. docket · checked Nov 28, 202648E in-service deadline for wind and solar that start construction after July 4, 2026.
IRC 48E · checked Nov 28, 2026Storage keeps full credit if construction starts by then.
IRC 48E · checked Nov 28, 202604 / The financing gap
Farms must fund 100% up front and operate 12+ months before competing for a grant of up to 25%: caps of $500,000 for renewables and $250,000 for efficiency. Ground-mount solar and wind on cropland are excluded. 91 FR 62600 · checked Nov 28, 2026
Illustrative project · capital stack
$750,000 project cost
The remainder the farm funds itself.
Up to 75% of cost, 80% guaranteed. FY2026 fees: 1% up front, 0.25% annual.
Federal Register, Mar 9, 2026 · checked Nov 28, 202610%, up to $50,000 per commercial unit. Each solar ag water pump is its own unit; shown here as one unit.
Utah Code 59-7-614 · checked Nov 28, 2026Competitive upside after 12 months of operation, not collateral.
91 FR 62600 · checked Nov 28, 2026Illustrative only. How grants and credits combine must be confirmed by a CPA for each project.
05 / The method
Farm records go in. One standard file comes out, written for whoever sits on the other side of the project.
In · farm records
AgX file
←Fee: paid by the farm client.
Bills, invoices and equipment gathered into one baseline.
No-cost tariff and utility programs before any capital project.
Eligibility, metering and the program stack, each with its citation.
Compliance and renewals for as long as the asset runs.
File standard
The same format for every farm, so a lender or credit buyer reads the tenth file as fast as the first, and files can be pooled.
Specimenillustrative, not a client file
06 / The map
Four views of the same two states: what farms spend, what they pay per kilowatt, where large load and geothermal are arriving, and where the dairy herds are.
Utah data centers under construction or permitted.
Utah legislative staff, March 2026 · checked Nov 28, 2026 $24.7MBLM geothermal lease sale in Millard and Beaver counties; top bid $1,207/acre.
BLM, Aug 18, 2026 · checked Nov 28, 2026Treasury Notice 2026-53 (Sept 8, 2026) lets existing digesters score 45Z against the farm's own past manure handling. That is a documentation job.
Treasury Notice 2026-53 · checked Nov 28, 202607 / Where private capital is going
Beaver County, Utah
Google signed a 396 MW, 15-year contract for geothermal power.
Fervo · checked Nov 28, 2026Millard County, Utah
A power-and-data campus on former farmland with 10,000 acre-feet of senior water rights.
Company and press reports · checked Nov 28, 2026Investment-grade yield
Blackstone Credit & Insurance, with Apollo and KKR insurance accounts, paid $5.34B for 49% of Williams' 2.6 GW of on-site gas plants.
Williams · checked Nov 28, 2026Scale it needs
How AgX bridges it
C-PACE originated nationally in 2025. C-PACE covers farm property in Utah and Colorado.
C-PACE national totals, 2025 · checked Nov 28, 2026AgX's role
Originate, standardize and service the farm side. AgX never owns, lends or brokers.
08 / Four lines
Each line answers the same five questions, in the same order.




09 / Partners
What each partner receives, the stage it arrives at, and who pays for it.
Door 01
Lenders, infrastructure and private-credit funds.
Door 02
Investor-owned utilities and rural co-ops.
Door 03
Solar, storage, transmission, data center, RNG and geothermal.
AgX does not broker securities, real estate or freight. AgX takes no fee from lenders, developers, credit buyers or carriers.
10 / Why AgX
No installer or developer conflict under the new REAP rule.
A back office already doing federal and state funding work for producers in Utah and Colorado.
Every program fact checked against the agency's own text and dated.
One file format, so projects can be pooled.
11 / Program tracker
Every row checked against the agency's own text on Nov 28, 2026.
| Program | What it pays | Status / date | Source |
|---|---|---|---|
| USDA REAP grant | Up to 25%, $500k / $250k caps, post-build | Rule effective Oct 16, 2026; next window not published | 91 FR 62600 · checked Nov 28, 2026 |
| REAP guaranteed loan | Up to 75% of cost, $25M cap, 80% guarantee | Open | Federal Register, Mar 9, 2026 · checked Nov 28, 2026 |
| IRC 48E | 30% (under 1 MW) | Wind/solar in service by Dec 31, 2027 | IRC 48E · checked Nov 28, 2026 |
| Utah RESTC | 10%, up to $50,000 per unit | In service before Jan 1, 2028 | Utah Code 59-7-614 · checked Nov 28, 2026 |
| Elective pay | Credit as cash for tax-exempt owners, incl. 501(c)(12) | — | IRC 6417 · checked Nov 28, 2026 |
| RMP Irrigation Load Control | $33.31–$39.97/kW per season | Enroll before late May | RMP Schedule 105 · checked Nov 28, 2026 |
| Xcel aggregator program | Up to $264.56/kW-year | 25 MW/yr through 2030 | CO PUC, Dec 15, 2025 · checked Nov 28, 2026 |
| Colorado Clean Diesel | Up to 45% | Rolling | CDPHE · checked Nov 28, 2026 |
| Utah Clean Fleet | 25–45% | Open | Utah DEQ · checked Nov 28, 2026 |
12 / Status and next 120 days
Verified items only.
agx.farm registered.
Ag Resource X LLC: Utah limited liability company.
Partner brief, file standard, and first pooled program design.
13 / Risks
D.D.C. 1:26-cv-03384; next window dates unpublished.
D.D.C. docket · checked Nov 28, 2026Dec 31, 2027 compresses wind and solar timelines.
IRC 48E · checked Nov 28, 2026Projects near load still need county approval and neighbors.
Demand charges and load-control payments are set by rate cases and can move.
Grant and rebate pools depend on appropriations.
Which is why every file is standardized.